Certified safety

ALUGLASS / System

Fire-rated systems that stay aligned with the architecture

The solution provides fire separation without turning the area into a foreign technical object inside the interior.

Load Safety and compliance in critical zones.
Code Transparency preserved where the project needs it.
Lifecycle Integration with doors, glazed walls and escape routes.

Visual scenarios

Fire-rated doors and partitions in real project settings

These views show proportion, materials and details that matter when the system becomes part of a space used every day.

Criteria
02 Criteria
Use
03 Use
Fire-rated glazed doors and partitions.
04 Fire-rated glazed doors and partitions.

What the project gains

Why this solution works in a live project

Fire-rated glazed systems for buildings that need safety, light and architectural control.

Safety and compliance in critical zones.

Transparency preserved where the project needs it.

Integration with doors, glazed walls and escape routes.

Technical configuration checked before production.

Specifications

Technical logic and system composition

Type
Fire-rated glazed doors and partitions.
Criteria
Configuration based on required rating and project scenario.
Use
Offices, retail, institutions and public buildings.

Scenarios

Project formats where the system performs best

  • Escape routes.
  • Separation between functional zones.
  • Commercial and administrative buildings.
  • Spaces where safety and light must work together.

Process

How ALUGLASS moves the project from request to handover

From the first brief to the final installation, the route stays readable: coordination, specification, production and fitting work as one coherent process.

01

Brief and survey

We clarify function, movement, dimensions and technical constraints before shaping the system.

02

Configuration and offer

Profiles, glass, hardware and installation details are combined into one coherent proposal.

03

Controlled production

Elements are prepared to the approved dimensions and specification, with attention to joints and finish.

04

Installation and handover

The system is installed on site with checks for alignment, operation and final details.

ALUGLASS / Request

Discuss the solution

We will prepare a proposal around your object, architecture, timeline and budget.

01 Fire-rated glazed doors and partitions.
02 Configuration based on required rating and project scenario.
03 Offices, retail, institutions and public buildings.

We will return with a clear proposal covering configuration, timing and installation.

FAQ

Frequently asked questions about the project and delivery

Short answers about timing, configuration, installation, warranty and the ALUGLASS workflow.

Is it selected by fire rating?

Yes, the configuration depends on project requirements and the fire safety scenario.

Can it still look premium?

Yes, if the details are planned early and integrated with the architecture.